EMC engagements for every stage of development

Most projects use one or two steps. Pick the ones that match where you are today.

  1. Architecture Review
  2. Layout Review
  3. Layout Remediation
  4. Pre-Lab Test Strategy
  5. Lab
  6. Failure Analysis & Mitigationif needed
Advisory Support: any time
Turnaround starts at the times shown and increases with project complexity. We confirm timing when we scope your project.

Architecture Review

Set the foundation before the first trace is routed.

Start with this step
Best when
Before routing is complete (some placement and routing may be done).
What we need
Schematic, BOM, board outline. Helpful if you have: product requirements, current board design, enclosure concept, designer notes.
What you get
Stackup and placement guidance, constraints, and a risk memo.
Follow-up
Review meeting.
Typical turnaround
Starts at 2 business days.

Related reading: PCB Floor Planning for Low EMI: Component Placement as Your First Line of Defense · 4-Layer SGPS Stackups: A Common Misuse and How to Improve EMC Performance

Layout Review

Catch return-path, grounding, and decoupling problems before fabrication.

Start with this step
Best when
Before design lock.
What we need
Schematic, BOM, Gerbers. Helpful if you have: product requirements, enclosure design, designer notes, test results.
What you get
An annotated report with fix recommendations.
Follow-up
Review meeting, and a board review after fixes.
Typical turnaround
Starts at 3 business days.

Related reading: Crossing a Split in the Reference Plane: Why It Fails EMC Testing · Void Crossings: How Moving Traces a Few Centimeters Reduces EMC Risk · Why Microcontrollers Need a Solid Reference Plane for EMC

Layout Remediation

Turn review findings into a corrected layout.

Start with this step
Best when
After a layout review or failure analysis.
What we need
The layout review and your design package.
What you get
Applied fixes, a change log, and residual risks.
Follow-up
One revision included, plus a review meeting.
Typical turnaround
Starts at 3 business days.

Related reading: Copper Pour on Signal Layers: When Flooding Does More Harm Than Good · Don’t Blindly Copy a Datasheet Reference Layout: An EMC Example

Pre-Lab Test Strategy

Walk into the lab with a plan built around your real operating modes.

Start with this step
Best when
Any point in development.
What we need
Product description (operating modes and levels), product requirements, 3D models or images.
What you get
A test plan.
Follow-up
One revision included, plus a review meeting.
Typical turnaround
Starts at 5 business days.

Related reading: Common-Mode Current in Offline Converters: Controlling Transformer Noise Between Isolated Domains · How to Route Differential Pairs for EMC: What to Avoid and What to Prioritize

Failure Analysis & Mitigation

Find the root cause and fix it with a targeted change.

Start with this step
Best when
After a test failure.
What we need
Test results, schematic, BOM, Gerbers, enclosure design.
What you get
Root-cause analysis, corrective actions, and follow-on test planning.
Follow-up
Review meeting.
Typical turnaround
Starts at 3 business days.

Related reading: Crossing a Split in the Reference Plane: Why It Fails EMC Testing · Common-Mode Current in Offline Converters: Controlling Transformer Noise Between Isolated Domains

Advisory Support

A second opinion or a quick answer, whenever you need it.

Start with this step
Best when
Any time during development or project planning.
What we need / what you get
Varies. Tell us the question and we’ll scope it.
Responses
Email within one business day. Pre-paid advisory hours are available and can be applied to any service above.